Pipeline Protection, MB

Project Overview

Project Type

Pipeline Protection

Location

Red River, St. Clements, Manitoba

Client

Manitoba Hydro

Duration

Six Weeks

Installation of an articulating concrete block mat used for the protection of a pipeline crossing.Installation of an articulating concrete block mat used for the protection of a pipeline crossing.

The project involved the protection of a natural gas pipeline with the installation of bedding material and articulating concrete block mat. The worksite, located on the Red River, presented challenges to the diving crew including limited visibility and substantial current.

The work encompassed the positioning of 56 mats, weighing 3,600 kg each, positioned over bedding material which stretched 200 metres along the pipeline. All materials were transported two kilometres upstream from the project staging area where a temporary wharf was constructed.

The articulating block mats were hoisted using a 35-ton crane and a 12×20 metre barge. Additional equipment assisted in the final positioning including scanning sonar, pipe locator, and divers to ensure accurate alignment.